Answer:
4.63 cubic yard.
Step-by-step explanation:
Given,
The length of sidewalk, l = 100 feet,
Width, w = 5 feet,
Depth, h = 3 inches = 0.25 feet,
Thus, the volume of the concrete needed for making the sidewalk,


= 125 cubic feet,
∵ 1 cubic yard = 27 cubic feet,
⇒ 1 cubic feet =
cubic yard,
Thus, the quantity of concrete needed =
≈ 4.63 cubic yard.

<u>Answer</u><u>:</u>
<u>
</u>
<u>Hope </u><u>you</u><u> could</u><u> get</u><u> an</u><u> idea</u><u> from</u><u> here</u><u>.</u>
<u>Doubt</u><u> clarification</u><u> </u><u>-</u><u> </u><u>use </u><u>comment</u><u> section</u><u>.</u>
Answer:
7 9/10
Step-by-step explanation:
First, we need to add 4 2/3 and 5 2/5.
We should begin with converting the fractions into improper fractions.
4 2/3 + 5 2/5= 14/3 + 27/5
Now, we find the common denominator
= 70/15 + 71/15
We can add:
= 141/15
And simplify.
= 9 2/5
Finally, we subtract 1 1/2 from 9 2/5
Your answer is 7 9/10. Hope this helps!
Please Mark Brainliest
Answer:
I think the answer is b
Step-by-step explanation: