Answer: ![(-\infty, -4]](https://tex.z-dn.net/?f=%28-%5Cinfty%2C%20-4%5D)
Curved parenthesis at negative infinity
Square bracket at -4
====================================================
Work Shown:

The last inequality shown above is the same as saying 
Converting this to interval notation leads to the final answer of ![(-\infty , -4]](https://tex.z-dn.net/?f=%28-%5Cinfty%20%2C%20-4%5D)
Note the use of a square bracket at -4 to include this endpoint. We can never include either infinity, so we always use a parenthesis for either infinity.
Answer:
the independent variable is amount being paid per hour, as the final outcomes relys on that answer. the dependent variable is the hours worked, as thats the variable that can be changed.
Let the two numbers be x and y
Then
x + y = 60
And
x - y = 2
x = y + 2
Putting the value of x in the first equation we get
x + y = 60
y + 2 + y= 60
2y + 2 = 60
2y = 60 - 2
2y = 58
y = 58/2
y = 29
Now putting the value of y in the first equation we get
x + y = 60
x + 29 = 60
x = 60 - 29
x = 31
So the value of the two numbers comes out to be 31 and 29. I hope the procedure is clear enough for you to understand.
Answer:
b = 12 ft
Step-by-step explanation:
Given Data:
Height = h = 5 ft
Area = A = 60
To Find Out:
base = b =?
Formula:
A= b×h
b = A÷h
Solution:
b = A÷h
b = 60÷5
b = 12 ft
Answer:
No because the leading coefficient is always the value with the greatest exponent. The leading coefficient is -2.
Step-by-step explanation: