Actually i’m pretty sure what you would do is multiply 24,50 by 5, because he wrote 5 checks of that amount. then you would subtract that from the total of $450. Then multiply 45 by 3 because he deposited three deposits of $45, and add that amount to the number you got after subtracting 24.50
See the explanation
<h2>
Explanation:</h2>
Remember you have to provide complete questions in order to get exact answers. Here I'll provide a general explanation, so:
<h3>First.</h3>

The slope is:

The y-intercept is:

By using graphing tool, we get the first graph shown below.
<h3>Second.</h3>

The slope is:

The y-intercept is:

By using graphing tool, we get the second graph shown below.
<h3>Third.</h3>

The slope is:

The y-intercept is:

By using graphing tool, we get the third graph shown below.
<h3>Fourth.</h3>

The slope is:

The y-intercept is:

By using graphing tool, we get the fourth graph shown below.
<h2>Learn more:</h2>
Linear inequalities: brainly.com/question/12984296
#LearnWithBrainly
Answer: 9x-3x and 5x+x
Step-by-step explanation:
1. Brianna's thinking is incorrect because of course, when x is 0, the expression will equal whatever value isn't an x term. To find equivalent expression, you actually need to find which expressions have the same amount of x terms and the same value.
2. Expressions A and C are equivalent.
3. Expression A can be simplified, as you can do 9x - 3x = 6x, so your final expression would be 6x - 4. Expression C can also be simplified with 5x + x = 6x, which can then also be written as 6x - 4. This means both expressions have the same amount of x terms, and the same value, so they are equivalent.
Since <span><span>−y</span></span> does not contain the variable to solve for, move it to the right side of the equation by adding <span>y</span> to both sides.<span>x=<span>y+<span>30</span></span></span>
Answer:
a) 86%
b) 2nd unit = 82 hs.
3rd unit = 75 hs
c) 100th unit = 36 hs
Step-by-step explanation:
We can model the learning curve for manufacturing the units as:

where t is the time for the Xth unit, and a and b are parameters that we will calculate from the data,
We know that t(1)=95. Then, we have:

And we know that the fourth unit (X=4) take 71 hours to be completed (t(4)=71). Then, we can calculate the other parameter as:

We have the model for the learning curve:

The learning rate percentage is calculated from the b parameter:

The learning rate percentage is 86%.
b) The most likely times required for the 2nd and 3rd units are calculated with the model:

c) If we use the model to calculate the time required for the 100th unit, we have: