Multiply each hourly rate by x ( time to complete the work) add it to the service call for each and then set the equations equal:
50 + 40x = 30 +45x
Subtract 30 from both sides:
20 + 40x = 45x
Subtract 40x from both sides:
20 = 5x
Divide both sides by 5
x = 4
The length is 4 hours.
Answer: 8.85km
Step-by-step explanation:
8,850m = 8,850 m⋅1 km / 1,000 m
Answer:
Non-linear and decreasing so B
Step-by-step explanation:
It is non-linear as it is not a straight line
It's also going down so its decreasing
Answer:
Step-by-step explanation:
A. 7x + 52
Add your like terms (the numbers with variables and the numbers without)
B. 13x + 142
C. Put 8 in for x.
13(8) + 142 = 246 points