Answer:
Samantha percent error was 18%.
Step-by-step explanation:
Answer:
Rs 17 3/4
Step-by-step explanation:
Cost of 6 1/2 m = 115 3/8
Cost of 1 m = x
- x = 115 3/8 ÷ 6 1/2
- x = (115*8 +3)/8 ÷ 13/2
- x = 923/8 × 2/13
- x = 923/(4*13)
- x = 923/52
- x = 17 39/52
- x = 17 3/4
Cost of 1 meter is Rs 17 3/4
Answer:
848.23
Step-by-step explanation:
Step 1: Find Volume Of The The Cake
Volume = 
Evaluate: ~848.23
Step 2: Find The Part The Was Eaten:
Full Circle: 360
Eaten = 25
Part: 25/360 = 14.4
Set 3: Find Volume Eaten:
14.4/848.23 = 58.90
She can give 7.29 ft or 7.3 ft of yarn to her 17 students given that the total measurement of the yarn is 124 ft.
solution:
124ft/17students - the operation used is division, dived 124ft w/c is the measurement of the yarn by 17 students.
7.294117647058824 - simplify the answer by rounding it off, at least one or two decimal points; making it 7.29 ft or 7.3ft
Answer:
- a. More than 20
- b. Less than 10
- b. Less than 0.2
Step-by-step explanation:
- 212.5
- 9.7
- 0.1608
Hope it helped you