Answer: w= 1/5
Step-by-step explanation:
11/15=8/15 -w
-W= 8/15 -11/15
-w= 8-11/15 =-3/15
-w=-3/15
w=3/15= 1/5
Answer: Object 2
Step-by-step explanation:
85/10 = 8.5
125/10 = 12.5
Object 2 moves 4m faster per second.
I think it’s A hope this helps
Answer:
Candace must make 32 sales.
Step-by-step explanation:
You can describe Candice weekly pay as a first degree function.
In our function, each sale n is the independent variable and her pay P is the the dependent variable. P is dependent of n, so we are going to write as P(n).
So, we can model the equation of P as a function of n by the following equation:
P(n) = 425 + 17.75n,
where, as the problem states, 425 is the flat rate and 17.75 is her comission for each sale n.
Now, the question is how many sales must Candace make to make $993 in one week. So, we want P(n) to be equals to $993 and we have to find n.
993 = 425 + 17.75n
Now we just need to solve this equation
993-425 = 17.75n
568 = 17.75n
n = 568/17.75
n = 32
So, to make $993 in one week, Candace must make 32 sales.
Answer:
4%
Step-by-step explanation:
Actual length of wire = 5 cm
The measured length of wire = 5.2 cm
We need to find the percent error in the measurement of the length of wire. It can be calculated as follows :
![\%=\dfrac{\text{measured length-actiual length}}{\text{actual length}}\times 100\\\\=\dfrac{5.2-5}{5}\times 100\\\\=4\%](https://tex.z-dn.net/?f=%5C%25%3D%5Cdfrac%7B%5Ctext%7Bmeasured%20length-actiual%20length%7D%7D%7B%5Ctext%7Bactual%20length%7D%7D%5Ctimes%20100%5C%5C%5C%5C%3D%5Cdfrac%7B5.2-5%7D%7B5%7D%5Ctimes%20100%5C%5C%5C%5C%3D4%5C%25)
So, the required percent error is 4%.