The projected sales for the next day is $6844, 15% higher than the sales of the previous day.
Day 1 = 4500
Day 2 = 5175
Day 3 = 5951
Day 2 / Day 1 = 5175 / 4500 = 1.15 x 100% = 115%
Day 3 / Day 2 = 5951 / 5175 = 1.15 x 100% = 115%
Based on the above computation, projected sales of the next day is 15% higher than the sale of the previous day.
Day 4 / Day 3 = x / 5951 = 1.15 x 100% = 115%
x / 5951 = 1.15
x = 1.15 * 5951
x = 6843.65 rounded up to the nearest one 6844
To check:
Day 4 / Day 3 = 6844 / 5951 = 1.15 x 100% = 115%
Answer:
Separate it into smaller figures.
Step-by-step explanation:
The figure can be separated into a triangle on the top, and 2 trapezoids on the middle and the bottom.
The area of the triangle is bh/2, which is (4 x 6)/2, which is 12.
The area of the trapezoid in the middle is .5(b1+b2)h, which is .5(6+4)3, which is 15.
The area of the trapezoid on the bottom is .5(6+5)2, which is 11.
Now, add them to get 12+11+15 which is 38.
A= ((a+b)/2)h
a=base
b=base
h=height
Step-by-step explanation:
<u>G I V E N</u>
Speed of driver = 5 miles/hours
Distance to be covered = 62.8 miles
<u />
<u>F O R M U L A ~ U S E D</u>
Speed = Distance/Time
<u>S O L U T I O N </u>
Time = Distance/Speed
= 62.8 miles / 5 miles / hour
= 12.56 hours
It will take 12.56 hours to cover 62.8 miles, if the driver is moving
with 5 miles/hours