Answer:
1. a. 117.
2. $2,051.48
3. 592.82
4. 1472.01
5. d. 4116.11
6. d. 24
Step-by-step explanation:
Economic Order Quantity : 
Economic order quantity is 
EOQ = 117
2. ordering cost :
( total demand / EOQ ) * Ordering cost
( 600 / 117 ) * 400 = $2051.28
3. Holding cost :
Total demand * holding cost per unit
= 592.82
Reorder Point = Daily Demand * lead time
Reorder point = 600 / 350 * 14 = 24
Usually, Δ stands for a difference: if you have two quantities a₂ and a₁, their difference a₂-a₁ can be shortened as Δa.
This said, your formula is not set up correctly: the linear speed can be found with the formula:
v = ω·r
where r is the radius and <span>ω is the angular frequency, which is given by:
</span>ω = Δα / Δt
Substituting this into the one above, you find the correct formula:
<span>v = (Δα / Δt) · r
The problem gives you directly </span>Δα, which is 1/3 rad, because does not say at what angle the point started moving and at what angle it stopped.
Similarly, for the time you have Δt, which is 20 s.
Therefore, plugging in the numbers you get:
v = (Δα / Δt) <span>· r = (1/3 </span>÷ 20) × 10 = 1/6 = 0.167 cm/s
To calculate 65 of 440, we solve the problem by using the following formula: (X*Y)/100 where X=65 and Y=440.
Thus, when we enter 65 and 440 into our formula, we get this:
(65*440)/100 = answer
First we multiplied 65 by 440 and then we divided that by 100. When we did this, we found the answer to be 286.
Therefore, 65 percent of 440 is 286.