5000-850=
$4150 left to raise
$4150/83 students=
$50/student
Answer:
The distance between the starting point and the end point
Step-by-step explanation:
5.6 is the correct answer because 1.3 +4.3 would be 5.6 so the next one in the sequence is 9.9
Answer:
Step-by-step explanation:
Curvilinear relationship
A curvilinear relationship is a type of relationship in which there are two variables. As and when the value of one variable increases, so does the value of the other. This continues until a certain point, after which an increase in one variable decreases the value of the other.
Example:
The two variables are - Work pressure and work performance. As work pressure increases, work performance increases until a certain point. After a threshold, when work pressure exceeds, work performance drops. This results in a curvilinear relationship between the two variables.