Answer:
1/5x(41-19h)
41/5-19/5h
Step-by-step explanation:
Answer: Y=-3x+5
Explanation:
Μ = (0×0.026) + (1×0.072) +(2×0.152) + (3×0.303) + (4×0.215) + (5×0.164) + (6×0.066)
μ = 0 + 0.072 + 0.304 + 0.909 + 0.86 + 0.82 + 0.396
μ = 3.361 ≈ 3.4
We need the value of ∑X² to work out the variance
∑X² = (0²×0.026) + (1²×0.072) + (2²×0.152) + (3²×0.303) + (4²×0.215) + (5²×0.164) + (6²×0.066)
∑X² = 0+0.072+0.608+2.727+3.44+4.1+2.376
∑X² = 13.323
Variance = ∑X² - μ²
Variance = 13.323 - (3.4)² = 1.763 ≈ 2
Standard Deviation = √Variance = √1.8 = 1.3416... ≈ 1.4
The correct answer related to the value of mean and standard deviation is the option D
<span>
An employee works an average of 3.4 overtime hours per week with a standard deviation of approximately 1.4 hours.</span>
You can draw a right triangle with the informatio.
The vertical change in elevation (unknown) is the opposed leg to the angle 15°
The distance from the surveyor to the point vertically below the point on the mountain is the adjacent leg = 6 miles.
Then tan(15°) = x / 6 => x = 6tan(15) = 1.61 miles
Answer: 1.61 miles
Answer:
15/4
Step-by-step explanation:
3/4:1/5= 3/4*5= 15/4