1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Kobotan [32]
4 years ago
5

A chip company has two manufacturing plants. Plant A produces 40% of the chips and Plant B produces 60% of the chips produced by

the company. The company knows that 2% of the chips produced by plant A are defective and 1% of the chips produced by plant B are defective. If a randomly chosen chip produced by the company is defective, what is the likelihood that the chip came from plant A
Mathematics
1 answer:
erik [133]4 years ago
6 0

Answer:

P(A/D) = 0.5714

Step-by-step explanation:

Let's call A the event that a chip is produced by Plant A, B the event that a chip is produced by Plant B and D the event that the chip is defective

So, the likelihood or probability P(A/D) that a chip came from plant A given that the chip is defective is calculated as:

P(A/D) = P(A∩D)/P(D)

Where P(D) = P(A∩D) + P(B∩D)

Then, the probability P(A∩D) that a chip is produced by plant A and it is defective is calculated as:

P(A∩D) = 0.4*0.02 = 0.008

Because, Plant A produces 40% of the chips and 2% of the chips produced by plant A are defective.

At the same way, the probability P(B∩D) that a chip is produced by plant B and it is defective is calculated as:

P(B∩D) = 0.6*0.01 = 0.006

So, P(D) and P(A/D) are equal to:

P(D) = 0.008 + 0.006 = 0.014

P(A/D) = 0.008/0.014 = 0.5714

it means that if a randomly chosen chip produced by the company is defective, the likelihood that the chip came from plant A is 0.5714

You might be interested in
PLEASE HELP!!!
Zanzabum

Answer:

Step-by-step explanation:

its not B

6 0
3 years ago
Convert 11 years to hours
yan [13]

Answer:

96360

Step-by-step explanation:

search hours a month then multiply that by 12

5 0
3 years ago
Read 2 more answers
Identify the function g(x) that is a vertical stretch by a factor of 6, a shift right 3 units, and
tia_tia [17]
Well the actual answer is 6x=6788. Na I’m just kidding juss needa stack up these points✨
8 0
3 years ago
What number has 3 hundreds 4 more tens than hundreds and 1 more one than hundreds
Anettt [7]

Answer:

4400? I think that's what u meant

7 0
4 years ago
WILL GIVE BRAINLIEST!!!
amm1812

Answer:

Definitely the second choice :)

4 0
3 years ago
Read 2 more answers
Other questions:
  • Which formula can be used to describe the sequence below?<br> -8, -5, -2, 1,4,
    7·2 answers
  • A rectangular bin is going to be made with a volume of 492 in3. The base of the bin will be a square and the top will be open. T
    14·1 answer
  • What is the surface area of the box formed by the
    11·1 answer
  • Is 14 quarter inches the most common measurement
    15·1 answer
  • What is the answer to 28 3/8- 19 5/6 and 18 2/5- 9 13/15
    9·1 answer
  • A triangle has vertices at (4,-2), (2,2) and (4,6). What are the vertices of the image of the triangle after applying the transl
    7·2 answers
  • If p is directly proportional to q, and p = 40 when q = 15, find q when p = 64
    12·1 answer
  • Write the equation of a line, in slope-intercept form, that has a slope of m=9 and passes through the point (4, 31) .
    11·2 answers
  • One motorist travels 5 km.hr faster than another. They leave from the same place and travel in opposite directions. What is the
    14·1 answer
  • PLEASE HELP 33 POINTS AND I WILL MARK BRAINLIEST!!!!!!!! THANKS!!!!!!!!!!!
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!