1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
bulgar [2K]
3 years ago
11

Complete the square to rewrite y = x^2 – 6x + 14 in vertex form. Then state whether the vertex is a maximum or minimum and give

its coordinates.
Mathematics
2 answers:
sergejj [24]3 years ago
7 0

Answer:

Vertex is minimum.

Coordinate is (3,5)

Step-by-step explanation:

Given :  y = x^2-6x + 14

To find : Complete the square to rewrite in vertex form. Then state whether the vertex is a maximum or minimum and give its coordinates.

Solution :

The general vertex form is y=a(x-h)^2+k

where (h,k) is the vertex of the function

Converting into vertex form by completing the square,

y = x^2-6x + 14

y = (x^2-2\times 3x+3^2-3^2)+14

y = (x^2-2\times 3x+3^2)+14-9

y = (x-3)^2+5

This is the vertex form where a=1, (h,k)=(3,5)

If a>0 then vertex is minimum

If a<0 then vertex is maximum.

In our case, 1>0 then vertex is minimum.

Coordinates is (3,5).

Burka [1]3 years ago
4 0
Y=x²-6x+14
y=(x²-2*3x +3²-3²)+14
y=(x²-2*3x+3²)+14-9
y=(x-3)²+5

a=1
p=3
q=5


a>0 ⇒ vertex is minimum

V(p,q) ⇒ V(3;5)




Regards M.Y.

You might be interested in
Convert 27day 8hour into second
Nataliya [291]
27 days and 8 hours = 656 hours
27 x 24 = 648
648 + 8 = 656
24 hours = 3,600 seconds
656 x 3,600 = 2,361,600 seconds

The answer is 2,361,600 seconds.
7 0
3 years ago
9.12cm<br> 10.36cm<br> 11.34cm<br> 12.61cm
Vinvika [58]
Tan80 = QR / RS
QR = 5.67 (2)
QR = 11.34

answer

<span>11.34cm</span>
8 0
3 years ago
Using new equipment, a worker finished 4 more parts in an hour than was planned and fulfilled his daily task not in 8 hours, but
UNO [17]
Let the planned number of parts per hour = x 
<span> Then the planned number of parts for the day = 8x 
</span><span> By finishing 4 more parts in an hour than was planned (x + 4) he fulfilled his daily task in 6 hours. 
</span><span> So he finished 6(x + 4) parts that day. 
</span><span> 6(x + 4) = 8x 
</span><span> 6x + 24 = 8x 
</span><span> 2x = 24 
</span><span> x = 12 </span>
6 0
3 years ago
Solve 8[7-(6x-6)]+6x=0.
zavuch27 [327]
I believe that X would be -2.47619.
 First you distribute the -1 in front of the parenthesis. Then distribute the 8 outside of the bracts. And finally just solve for X by combing like terms.
4 0
3 years ago
Which can be solved by using square roots? Choose all that apply. (Hint: Make sure each equation is set equal to 0 before you ma
Masteriza [31]

Answer: I don't know

Step-by-step explanation:

5 0
3 years ago
Other questions:
  • What is 32% of 60 as a decimal?
    8·1 answer
  • Which number<br> is between 2.23 and 2.24 on a number line?
    11·2 answers
  • there are 266 students watching a play in the auditorium. there 10 rows with 20 students in each row and 5 rows with 8 students
    9·2 answers
  • NEED HELP WITH A MATH QUESTION WITH FINDING A SURFACE AREA OF A SQAURE PYRAMID
    8·1 answer
  • Find the equation of a line perpendicular to y - 12 = 2x – 8 that passes through the point (2, 3). (answer in slope-intercept fo
    5·2 answers
  • HELP PLEASE!! Write an equation in slope-intercept form for the line perpendicular to y=−4x+1 that passes through the point (−7,
    7·1 answer
  • Help with ordered pairs
    14·1 answer
  • Help please 1 please
    6·2 answers
  • The winning times for a race are shown in the table.
    6·1 answer
  • Please Help need this ASAAP!! The First and correct answer will be marked brainlest!!
    10·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!