If there is 20 stripes total, that means that the pattern can go through the a full cycle (2 green stripes, 3 blue stripes, and 1 yellow stripe) 3 times. Making that 3 blue stripes x 3 times through the cycle.
Which means 9 blue stripes.
Answer: A reflection (Across the y-axis)
Step-by-step explanation:
Transformation possiblitites:
Translation: After plotting the points you gave I came to the conclusion that a translation could not be the right transformation due to the fact that the point would move away the same units on a graph as the original point.
Rotation: The new point doesn't seem when graphed to have rotated, as it remained across from the orignial point on the graph.
Dilation: The new point if dilated wouldn't be in close proximity with the original point.
The selling price of the computer is $35.
Answer: 7.8 days
<u>Step-by-step explanation:</u>
Painter can get the job done in 15 days so gets
of the job done in 1 day.
Coworker can get the job done in 10 days so gets
of the job done in 1 day.
Together, they get
of the job done in 1 day.
Painter worked for 3 days so completed
of the job.
That leaves a remaining of
of the job to be completed.
Let x represent the number of days it will take them to work together.
Painter + Coworker = Together

Multiply by 30 to eliminate the denominator:

Simplify and solve for x:
2x + 3x = 24
5x = 24

x = 4.8
Remember that Painter worked 3 days alone in addition to the 4.8 days they worked together.
So the total time to paint the building is 3 + 4.8 = 7.8