1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
BigorU [14]
3 years ago
14

What is the volume of the sphere? brainiest and thanks for first answer

Mathematics
1 answer:
Fittoniya [83]3 years ago
4 0
The volume of the sphere is 904.78 units cubed.
You might be interested in
N 1846 the depth of the river was 5 feet deep. In 1847 it dropped to 3.2 feet. This year, 1848, it rose to 6.6 feet. Find the pe
gayaneshka [121]

Answer:

40.4%

Step-by-step explanation:

Given data

Initial depth= 5feet

Final depth= 5-3.2+6.6= 8.4feet

Hence the percent change

% change= FInal-initial/final*100

% change= 8.4-5/8.4*100

% change= 3.4/8.4*100

% change= 0.404*100

% change=40.4%

Hence the percent change is 40.4%

5 0
3 years ago
What does this equal<br> 2 [30/5] =
lorasvet [3.4K]
The correct answer is 12
6 0
3 years ago
Read 2 more answers
Help quick with this question
Anit [1.1K]
I’m pretty sure it’s 200 :)
8 0
3 years ago
Read 2 more answers
Find the value of x<br> 6x-17 and 4x+7
astra-53 [7]

Answer:

a.-11 .     b.11

Step-by-step explanation:

6x-17= -11 .       4x+7= 11

5 0
3 years ago
if A and B together can do a piece of work in 10 days and B along can do it in 15 days, how many part of the work does A complet
anzhelika [568]

Answer:

1/5

Step-by-step explanation:

Well work can be defined as: work = rate \ *\ time

where rate=amount of work that can be done in one unit of time

let a = rate of work A does in a day

let b = rate of work B does in a day

this means that: 10a + 10b=1 where work=1 and it just means the entire job has been completed.

Since b can do it alone in 15 days, this means that: 15b=1

If we divide by 15 here, we get the equation: b=\frac{1}{15}

We can now use this definition to substitute it into the first equation we made.

10a + 10(\frac{1}{15}) = 1

Multiply the 10 and 1/15

10a+\frac{2}{3}=1

subtract 2/3 from both sides

10a=\frac{1}{3}

Now divide both sides by 10

a=\frac{1}{30}

Now multiply this by 6, since we a represents the amount of work that can be done in a day, we want to find how many parts of the work can be done by a in 6 days

6a=\frac{6}{30}

Now divide both the numerator and denominator by 6

a=\frac{1}{5}

8 0
2 years ago
Other questions:
  • A model car has a scale factor of 1/64. The diameter of a tire on a model is .39 inches . What is the diameter of a tire on an a
    8·1 answer
  • Question D- If the area of a square is 121 square centimeters, what is its side length?
    15·1 answer
  • Factor the following:
    8·1 answer
  • Are these two correct if not whats the answer?
    14·2 answers
  • In 3/5 divided 3 = 1/5 the ____ is 3
    13·1 answer
  • What is the unit rate of mile to gallon of 30 miles and 1 gallon?
    9·1 answer
  • A shop keeper has offered an item for sale. Its label price is Rs . It is not sold in one-month period and after one month its l
    10·1 answer
  • What is the surface area?
    12·1 answer
  • Hi can someone help me with the question above?
    8·1 answer
  • 3. An art class charges each student $3 to attend plus a fee for supplies. Today, $20 was collected for the 5 students attending
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!