Answer:
1/36
Step-by-step explanation:
The only way of getting a total of 11 is rolling a 5 and a 6.
On each dice that is a 1/6 possibility
Multiply both possibilities to get 1/36.
To compute the mean, you simply have to sum all the elments in the data set and the divide the sum by the number of elements:

To compute the variance, we first need to compute the distance of each element from the mean. To do so, we build a "parallel" dataset, given by the difference of every value and the mean:


Now we need those difference squared:

The variance is the mean of this new vector, so

Finally, the standard deviation is simply the square root of the variance, so you have

$15
The cost goes up by $5 each time
It is a function. It passes the vertical line test, meaning for each x there's at most one y.
When x=2 we see y=-3 as (2,-3) is a point on the graph
EG = 40
Point F (EF) = 2/5
EF = 2/5 × 40
EF = 16
EF + FG = EG
16 + FG = 40
FG = 24
<span>d. 24</span>