Answer:
d) Teach her mother that colds are caused by viruses.
Answer:
When reviewing your project requirements, it is important to bring your entire team together and review the project part by part along with all the individuals who will participate in it.
Explanation:
Requirements review is a very important step in starting a project. This is because it allows the project to be placed in a document and can be analyzed in a decomposed way. That is, the project leader will be able to analyze each part of the project and make specific notes, modifications and anything else that can reduce flaws and increase the project's capacity to obtain positive results. However, it is important that after this analysis, the leader brings all the project members together and shows them everything that was decided by reviewing the requirements.
reaching the inner of ear due to earwax build up and he now has hearing loss
Leisure time activities
Explanation:
1. Sedentary activities:
Intensity level: Less than 3.0 METS
Energy spent: Less than 3.5 kcal/min
- Casual leisure walking
- Bicycling at 5mph
- Fishing
- Stretching exercise
- Slow dancing
2. Medium activities:
Intensity level: 3.0 to 6.0 METS
Energy spent: 3.5 to 7 kcal/min
- Walking at moderate speed of 3 to 4.5 mph
- Leisure roller skating
- Dancing including mild aerobic, line, ballroom folk dancing etc.
- Playing softball
- Moderate leisure activities like trampoline jumping
3. Vigorous activities:
Intensity level: More than 6.0 METS
Energy spent: More than 7 kcal/min
- Racewalking, jogging, running
- Bicycling at 10 mph
- High impact dancing like aerobic, step dancing
- Martial arts like karate, judo
- Playing football, basketball etc