Given that,
Design capacity = 6 furnaces per day
Effective capacity = 5 furnaces per day
Efficiency ratio if it repairs an average of 4 furnaces per day:
= (Actual capacity ÷ Possible capacity) × 100
= (4 per day ÷ 6 per day) × 100
= 0.667 × 100
= 66.7%
Therefore, the efficiency ratio is 66.7 percent.
Solution:
Given Information,
Heat input is (
) = 5.5 ×
Btu/h
Combustion efficiency of the boiler (
) = 0.7
Combustion efficiency after turn up (
) = 0.8
Operation Hour (t) = 5200h
Unit cost (c) = 
Calculate heat output from the boiler
=
x 
= 5.5 x
x 0.7
= 3.85 x
Btu/h
Calculate the heat input to the boiler after the tune-up
=
/ 
= 3.85 x
/ 0.8
= 4.8125 x
Btu/h
Calculate the saved energy after the tune-up
=
- 
= 5.5 x
- 4.8125 x
Btu/h
= 0.6875 x
Btu/h
Calculate the annual energy saving (
)
=
x t
= ( 0.6875 x
Btu/h ) ( 5200 hr/yr)
= 3575 x
Btu/h
Calculate the annual cost saving
Annual cost saving =
x Unit cost
= 3575 x
Btu/h x 
= 82225
Answer:
e. $20
Explanation:
The net asset value (N) for The New American Enterprise Mutual Fund's portfolio is given by the funds total value ($120,000,000) subtracted by its liabilities ($4,000,000) and then divided by the number of shares issued (5,800,000) .

The fund's net asset value is $20
Difference between beginning and ending CoG: 20,000-10,000 = 10,000
Difference + sold:
10,000 + 40,000 = 50,000
Answer: $50,000