1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Deffense [45]
3 years ago
14

5+3×2-6 and the value is 10

Mathematics
1 answer:
rodikova [14]3 years ago
7 0
Yes you are correct is 10
You might be interested in
A rectangular price tag has a perimeter of 28 centimeters. Its area is 40 square centimeters.
kirill [66]

Answer:

10 x 4

Step-by-step explanation:

what factors are there for 40?

1, 2, 5, 8, 10, 20, 40

A rectangle has 2 equal long sides and 2 equal short sides. The area is the short times the long.

10 plus 10 and 4 plus 4 equals 28. 4 x 10 equals 40.

5 0
3 years ago
Using each of the digits 1 to 9 once and only once form two whole numbers one of which is double the other
Vadim26 [7]
Answer
9,327 and 18,654
6 0
3 years ago
Please help!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
kirill [66]

Answer:

sin(x) = -sqrt2/2

tan(x) = -1

Step-by-step explanation:

Because it is between 270 and 360, sin is negative, so it is -sqrt2/2.

tan(x) is sin(x)/cos(x), so it is just -1.

6 0
3 years ago
In July, a new endoscopy and electrophysiological lab are opening up. It is projected 60 endoscopies and 5 EP studies will be pe
kupik [55]

Answer:

The number of FTE needed to be hired to cover the additional procedures per 7.5 day work is:

= 1.

 

Step-by-step explanation:

a) Data and Calculations:

                                                Endoscopies      EP Studies    Total

Projected number of studies         60                      5              65

Time in minutes for per study         5                     15

Total time required (in minutes) 300                     75           375

Full-time Employee (FTE) works 7.5-hour day or 450 minutes (7.5 * 60) per day.

b)The number of full-time employees (FTE) needed to be hired to cover the additional procedures per 7.5-day work is 1.  The FTE has 450 minutes available for the additional procedures.  She will only require 375 minutes.  Therefore, she has extra (idle) time of 75 (450 - 375) minutes per workday.

4 0
3 years ago
135÷5, draw two different ways to break apart the array . use the distributive property to write products for each different way
Inessa05 [86]
1 way is (100 divide by 5) +(35 divide by 5)
2 way is (50 divide by 5) + (85 divide by 5)
4 0
4 years ago
Read 2 more answers
Other questions:
  • 3) 8а - 5а answer please​
    10·2 answers
  • HELP WITH THIS QUESTION, ASAP!!
    13·1 answer
  • What does a2+b2=c2 mean ps yo you will get 20 points
    11·1 answer
  • What is linear mean?
    15·2 answers
  • 1/2k when k= 3/4 do I multiply
    12·2 answers
  • 3x+5=17 what's the answer
    10·2 answers
  • If someone can help It’ll be the best
    10·1 answer
  • Jackson currently has $35 in his bank account, and he is soving $15 weet to eventol be
    15·2 answers
  • HELP ME ITS MATH PLEASE
    8·2 answers
  • 2/5 of the pupils in Year 9 say
    12·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!