Answer:
The answer is D
Step-by-step explanation:
Crown me?
Answer: he has read 15% and still needs to read 85%
Step-by-step explanation: 300/20 is 15 so that’s the percent he has read. 100-15=85 so that’s the percent he still has left to read
Answer:
Cost, C = $28410.72
Step-by-step explanation:
We have, a concrete pillar has the shape of a cylinder.
Diameter of pillar is 8 m and ts height is 9 m
If concrete costs $87 per cubic meter, it is required to find the concrete cost for the pillar. For this lets find the area of cylindrical shape. So,

The cost of pillar at the rate of $87 per cubic meter will be :

Answer:
have:

Step-by-step explanation: