Answer:
are u kidding me it's literally D --_--
Step-by-step explanation:
9.6958 rounded to the nearest hundredth is 9.70
-
44cm
Answer:
12/5hours=2.4 hours
Step-by-step explanation:
Sam:6hours
Tom:4hours
This is a rate problem
Sam's rate is one job completed in 6 hours which is 1/6
Tom's rate is one job completed in 4 hours which is 1/4
Together, they could complete 1/4+1/6 of the job in y hours
We are trying to find the rate at which Sam and Tom could complete the job together, or one job in x days, for a rate of 1/y
1/4+1/6=1/y
The least common denominator is 12y
Multiplying through by the LCD which gives:
12y(1/4)+ 12y (1/6)= 12y (1/y)
3y + 2y=12
5y = 12
y=12/5 hours=2.4hours
Therefore it will take 12/5 hours or 2.4 hours to complete the job if they work together
D) (X,Y) <span> → (x + 4, y - 5).
HOPE THIS HELPED :-)</span>
Answer:
Option D.
3 equations with 3 variables
Step-by-step explanation:
The coordinates of a point in space must necessarily have 3 components. One to describe the distance on the x axis, another to describe the distance on the y axis to the point, and a third to describe the distance on the z axis.
If we have three variables, then 3 equations are needed to solve the system. With less than 3 equations it would be impossible to solver the system.
Therefore the correct answer is option D.
3 equations with 3 variables