Answer:
Internal rate of return = 12%
Explanation:
Below is the calculation of internal rate of return:
The new machine requires cash payment = $38198
Annual cash flows = $15904
Time period = 3 years
First divide the cash payment with the annual cash flow and then look at the factor table to find the interest rate at 3rd year.
Factor = 38198 / 15904 = 2.40
Now look the value 2.40 in the table:
Thus Internal rate of return = 12%
One of the most important lessons that the Starbuck's leadership lab provides to its store managers is developing the a sense of corporate pride and responsibility, along with the element of understanding the importance of a positive customer interface and assisting the manager's in developing that positive atmosphere in the context of their stores.
Answer:
Coworking is an arrangement in which workers of different companies share an office space, allowing cost savings and convenience through the use of common infrastructures, such as equipment, utilities, and receptionist and custodial services, and in some cases refreshments and parcel acceptance services.
Answer and Explanation:
The subject of the email is too long and contains all the information. The subject should have been: Proposal draft due on Friday. Rest of the information should have been included in the body of the email.
A Standard Cost Variance is a difference between the actual cost incurred and the standard cost against which it is measured.
The main difference between normal costing and standard costing is that normal costing uses actual costs for material and direct labor costs, whereas standard costing uses predefined costs for these two items. That's it.
This difference between standard cost and actual cost is called variance. An unfavorable variance occurs if the actual cost is higher than the standard.
The main difference between marginal costing and standard costing is that marginal cost is a subset of standard cost and standard is a superset of marginal costing. Description: Standard costing is a costing method and there are two types of costing methods.
Learn more about Standard Cost Variance here: brainly.com/question/25790358
#SPJ4