Answer:
0.833
Step-by-step explanation:
Scale factor is given by:
(length of larger figure)/(length of smaller figure)=(width of larger figure)/(width of the smaller figure)=3.4
The length of the larger figure will be given by:
length=(scale factor)*(length of smaller figure)
=3.4*6=20.4 cm
width of the larger figure will be given by:
width=(scale factor)*(width of smaller figure)
=3.4*4.5
=15.3 cm
Therefore the dimension of the new parallelogram will be 20.4 cm by 15.3 cm
5
Explanation:
2 - (-3) = 5
Answer:
The number of machines to complete job in 2 hours is 6.
Step-by-step explanation:
Using the relation of the rate of each one machine and knowing that adding up both rates.

Rate R =
'x' is the job
Rate S =
'x' is the job
So, using the equation of rates

Rate total is going to be a job in 2 hours so = 
<em>adding up</em>
<em>factoring the x</em>
<em>simplifying</em>
x= 
x= 6