.3 or 30 cents. you have to move the decimal place one to the left since it’s 10%
Answer:
Salary: $90,500
Step-by-step explanation:
In a set with mean and standard deviation , the zscore of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:
An employee was having their annual appraisal and the manager indicated that the employee salary for next year has a Z-score of 1.24. Approximately how much will this employee be paid next year in salary?
This is X when . So
Rouded to the nearest hundred of dollars:
Salary: $90,500
The answer would be 49ft.
1,225ft÷25ft=49ft
Based on the given parameters of a = 1.7 cubic feet and concrete for first 4 steps as 17 cubic feet, the concrete is required for the first 12 steps is 132.6 cubic feet
<h3>Arithmetic progression</h3>
- First term, a = 1.7 cubic feet
- Sum of first four terms = 17 cubic feet
Sn = n/2 {2a + (n - 1) d}
17 = 4/2{2×1.7 + (4 - 1)d}
17 = 2{3.4 + (3)d}
17 = 2(3.4 + 3d)
17 = 6.8 + 6d
17 - 6.8 = 6d
10.2 = 6d
d = 10.2/6
- Common difference, d = 1.7
Concrete required for first 12 steps;
Sn = n/2 {2a + (n - 1) d}
= 12/2{2×1.7 + (12-1)1.7}
= 6{3.4 + (11) 1.7}
= 6(3.4 + 18.7)
= 6(22.1)
= 132.6
Concrete required for first 12 steps = 132.6 cubic feet
Learn more about sum of arithmetic progression:
brainly.com/question/24205483
#SPJ1