Answer:
b
Step-by-step explanation:
$25 per day
it's "b" because as days increase the cost of dollars gets added by $25 per day.
Hope this helped!
Answer:
d
Step-by-step explanation:
Answer:
-2.61803398875, -0.38196601125
or
(-3±√5)/2
Step-by-step explanation:
First, expand. (2x+3)² = 4x²+12x+9=5
4x²+12x+4 = 0
Quadratic equations take the form ax²+bx+c = 0
In this case,
a = 4
b = 12
c = 4
You can solve with the equation x=(-b±√b²-4ac)/2a
Plug in:
(-12±√144-64)/8
(-12±√80)/8
(-12±√2^4×5)/8
(-12±4√5)/8
(-3±√5)/2
Final answer x = (-3±√5)/2
If you want decimal form: -2.61803398875, -0.38196601125
Answer = 1.414
I used the prime factorization method.
Hope this answers your question.
Answer:
The correct answer is 12 and a half or 13 weeks.
Step-by-step explanation:
First, convert the values to decimals.
27 1/2 = 27.5
2 1/4 = 2.25
Then, divide miles of road that need to be repaved by the number of miles that are repaved per week.
27.5/2.25 = 12.2222222222222
Round that up to 12 and a half weeks or 13 weeks.