1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
zhenek [66]
3 years ago
9

If fixed costs are $561,000 and the unit contribution margin is $8.00, what is the break-even point in units if variable costs a

re decreased by $0.50 a unit?
Mathematics
1 answer:
olga nikolaevna [1]3 years ago
4 0
The break even point is the point where in the total cost and the total revenue of the business are of the same value which means there is no profit or no loss. It is would be the minimum point that a business to reach in order to be able to recover the costs without any loss. At this point selling cost is equal to the sum of the fixed cost and the variable cost. To determine the break even point in units, we do as follows:

SC = FC + VC
Px = FC + Vx
where x is the number of units, P is the price per unit and V is the variable cost per unit.

x = FC / P - V
x = 561000 / (8.00 - 0.50)
x = 74800 units
You might be interested in
I need help can you guys help me with this question
Elden [556K]
The answer is
4.0000000000006667

7 0
3 years ago
What expression can be used for estimating 868 divided by 28
weeeeeb [17]
868 is about 870, and 28 is about 30, so your expression would be 870 divided by 30 which would be 29 and the actual answer is 31, so your estimate would be close to your actual answer.
6 0
3 years ago
Read 2 more answers
Gretchen has a set of blocks of heights 1, 2, and 4-centimeters. Imagine stacking the blocks one on top of the other to make a t
notsponge [240]

Answer:

t_{n}=t_{n-1}+t_{n-2} +t_{n-4}

Step-by-step explanation:

t_{n}=multiple ways to climb a tower

When n = 1,

tower= 1 cm  

t_{1}= 1

When n = 2,

tower =2 cm   

t_{2}= 2

When n = 3,

tower = 3 cm

it can be build if we use three 1 cm blocks

t_{3} = 3

When n = 4,

tower= 4 cm

it can be build if we use four 1 cm blocks

t_{4} = 6

When n > 5

tower height > 4 cm

so we can use 1 cm, 2 cm and 4 cm blocks

so in that case if our last move is 1 cm block then t_{n-1} will be

n —1 cm

if our last move is 2 cm block then t_{n-2} will be

n —2 cm

if our last move is 4 cm block then t_{n-4} will be

n —4 cm

 

t_{n}=t_{n-1}+t_{n-2} +t_{n-4}

4 0
3 years ago
Read 2 more answers
Write an equation of the line below
Alexandra [31]
Y=2x
the slope is 2/1 and the y-intercept is 0
8 0
2 years ago
The school you want to go to has an acceptance rate of 15%. That means that 15% of the students who apply to the school get in.
timama [110]

15/100 = 1800/x

15x=180,000

The answer is 12,000.

7 0
3 years ago
Other questions:
  • Based on the records for the past several​ seasons, a sports fan believes the probability the red team wins is 0.45. The fan als
    9·2 answers
  • What is a common multiple of 3,4,5 and 6?
    7·2 answers
  • What are the composite factor of 20
    8·2 answers
  • What is 8/32 times 14/21?
    14·1 answer
  • For the arithmetic sequence beginning with the terms (1, 4, 7, 10, 13, 16...},
    9·1 answer
  • HELLO Everyone ....I hope your safe and doing welll :))) anywayyyys have a good day:))
    9·2 answers
  • 3 ⅕ -⅔ divided by 2 ⅘
    12·1 answer
  • a sandbox is a square with an area of 32 square feet. What is the length of each side to the nearest tenth?
    5·1 answer
  • *PLEASE ANSWER IT'S CONFUSING!!!* *ILL GIVE BRAINLIEST*!!!!!
    9·2 answers
  • Arithmetic sequence, can anyone help with this questions plz?
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!