Answer:Another variant of the important rule above is ax ay. = ax-y. And there is also the following slightly related rule. (ax)y = axy ... 10-3 = 1. 103 = 1. 1000. • 156. 155 = 156-5 = 151 = 15. • (25)2 = 210 = 1024. • (320). 1. 10 = 32 = 9. • 8-. 2 ... If f(x) is an exponential function whose base equals 1 – that is if f(x)=1x. – then for n, m ∈ N ...
Step-by-step explanation:
Answer: 
Step-by-step explanation:
Given
Truck A speed is 
Truck B speed is 
Truck A leaves 2 hours before truck B
Distance traveled in the 2 hour

Suppose Truck B will catch truck A after t hours


Overtake time is 
Answer:
5 /448
Step-by-step explanation:
Radius in drawing = 1 9/16 in
The actual length of rope = 11 2/3 feets
Converting actual length to inches :
1 feet = 12 inches
11 2/3 feets = (11 2/3) * 12 = 140 inches
To obtain the scale used, we divide the Radius in the drawing by the actual length :
1 9/16 ÷ 140
25 /16 ÷ 140
25 /16 * 1 /140
= 25 / 2240
= 5 /448
Hence, scale is 5 /448 times the actual length of drawing
Hence :
The scale used is :
1 feet = 7.4666 inches
Answer:
The combined average is 94%
Step-by-step explanation:
for first period, number of students =40
average =96%
for second period, no of students =20
average =90%
but
let
=sum of students for the first period
=sum of students for the second period
for first period;


for second period,


therefore the combined average = 
that is

so combined average is 94%
Answer:
<em>X ball bearings will be made in 1 hour and 20 minutes</em>
Step-by-step explanation:
<u>Proportions
</u>
The proportions give us an important tool to easily solve common problems of any type. We know that:
Company ABC can make X ball bearings in 3 hours.
Company DEF can make X ball bearings in 4 hours.
Company GHI can make X ball bearings in 6 hours.
In one hour, each company can make
ABC: X/3 ball bearings
DEF: X/4 ball bearings
GHI: X/6 ball bearings
Working together, they can make
ball bearings. Operating
If they can make 3/4 of a ball bearing in one hour, then one complete ball bearing will need
hours to complete. It's equivalent to 1 1/3 hours or 1 hour and 20 minutes
X ball bearings will be made in 1 hour and 20 minutes