Answer:
1½ mile
Step-by-step explanation:
Given
3/10 mile = ⅕ hour
Required
Determine the distance in 1 hour
Since rate is constant, we have:
3/10 mile = ⅕ hour
Multiply both sides by 5
5 * 3/10 mile = ⅕ hour * 5
15/10 mile = 5/5 hour
3/2 mile = 1 hour
1½ mile = 1 hour
Hence,the child will walk 1½ mile in 1 hour
Answer:
1/16
Step-by-step explanation:
Demont made one fourth (
) pound of rock candy
He separates the candy into four sacks equally.
This is done by dividing the total fraction of candy of a pound of candy made by the number of sacks
The fraction of a pound of candy that will be in each sack therefore is:

Therefore, One-Sixteenth of a pound of candy will be in each of the sack.
Answer:
Project A :
NPV : $703,888.64
IRR : 44.882%
Project B:
NPV : $5,241.26
IRR : 49.662%
Project B is more profitable
Step-by-step explanation:
The NPV gives the difference between the present value of cash inflow and cash outflow over a certain period of time.
The Internal rate of return is the discount rate which makes the NPV of an investment 0. It is used to estimate the potential return on an investment. Investments with higher IRR are said to be better than those with lower IRR value.
Using the net present value, (NPV) Calculator, the NPV for project A is : $703,888.64
The IRR of project A is : 44.882%
The NPV for Project B is : $5,241.26
The Internal rate of return (IRR) : 49.662%
From the Internal rate of return value obtained, we can conclude that, project B is more profitable as it has a higher IRR than project A.
No that’s equivalent to 7 + 7x