Answer:
The correct option is A) Confidence level
Step-by-step explanation:
Consider the provided information.
From the provided information we get the sample size is 1910 professionals
The illustration showed that 26% of them said the biggest interview turnoff is that the applicant did not make an effort to learn about the job or the company. That's mean the point estimate is 26%
The margin of error was given as plus or minus 3±3 percentage points. The margin of error is the confidence interval which is plus or minus 3±3.
Now consider the provided option:
The correct option is A) Confidence level
Because from the above information we know the point estimate is 26% Sample size is 1910 and the confidence interval is 3±3.
$942.50.
$14,500 x 0.065 = $942.50
6.5% = 0.065
The answer to the question is <span>70.6179775281. which also can be converted to 71.</span>
Answer:
52.4
Step-by-step explanation:
Arc length = 2πr(θ/360)
r = 10
θ = 300°
Arc length = 2π(10)(300/360) = 20π(0.8333) = 16.666π ≈ 52.36
Answer:
368 square feet
Step-by-step explanation: