Hello there :-)
Total cost of job=
retail price of parts+overhead+cost of labor
overhead= cost of labor×overhead rate
Find labor cost
Let labor cost be x
242.58=98.7+0.65x+x
Solve for x
X=87.2. This is labor cost
Now find hourly labor cost
87.2÷8=10.9
Hope it helps
1.) C(t) = -0.30(t - 12)^2 + 40
for t = 12: C(12) = -0.30(12 - 12)^2 + 40 = -0.30(0)^2 + 40 = 40°C
For t = 24: C(24) = -0.30(24 - 12)^2 + 40 = -0.30(24 - 12)^2 + 40 = -0.30(12)^2 + 40 = -0.30(144) + 40 = -43.2 + 40 = -3.2°C
4.) F(t) = 9/5 C(t) + 32
for C(t) = 40°C: 9/5 (40) + 32 = 72 + 32 = 104°F
for C(t) = -3.2°C: 9/5(-3.2) + 32 = -5.76 + 32 = 26.24°F
5.) F(t) = 9/5 C(t) + 32 = 9/5 (-0.30(t - 12)^2 + 40) + 32 = -0.54(t - 12)^2 + 72 + 32 = -0.54(t - 12)^2 + 104
Answer:
the gcf of that is 10.
Step-by-step explanation:
-- Any "regular" polygon has all sides equal AND all angles equal.
-- The sum of the angles inside a 4-sided figure is 360° .
-- So it it's a regular figure, then each angle is 360°/4 = 90° .
-- The total angle around each vertex is 360° .
If 90° of them are inside, then the exterior angle is the remaining <u>270° </u>.