Answer:
1. There are 2,600 units in ending inventory.
2. Costs per unit under absorption costing $ 123
3.Value of ending inventory $ 319,800
Explanation:
Calculation of Ending inventory units.
Ending Inventory Units : Opening Units + Units produced - units sold
300 + 15,000 - 12700 = 2,600 units
Calculation of per unit cost under absorption costing
Under absorption costing, direct manufacturing costs as well as indirect factory overheads are considered.
Per units costs
Direct Materials $ 20
Direct Labour $ 60
Variable overhead $ 13
Fixed Overhead $ 30
Total costs per unit $ 123 under absorption costing
Calculation of ending inventory under absorption costing
The ending inventory calculated earlier of 2.600 units is multiplied by the per unit costs of $ 123 per unit to get the value of the ending inventory
$123 * 2600 units = $ 319,800
Answer:
the bond's real return for the year is 6.18 %.
Explanation:
First find the nominal return of the bond then the real return as follows :
PV = - $946.02
Pmt = $1,000 × 5.10% = $51
P/yr = 1
FV = $979.58
n = 1
r = ?
Using a Financial Calculator, the nominal return of the bond, r is 8.9385 %.
Real Return = ( 1 + nominal return) / (1 + inflation rate) -1
= (1 + 0.089395) / (1 + 0.026) - 1
= 0.0618 or 6.18 %
Answer:
A. higher production results in a greater supply
Explanation:
Answer:
C. product use
Explanation:
Based on the information provided within the question it can be said that in this scenario Eaton most likely adopted a product use segmentation strategy. This strategy basically focuses on finding the selling the same products but in different variations for different uses in many markets. Which is what Eaton's website seems to be doing by offering the same product to different markets such as aerospace, hydraulics, and electrical.
Answer:
Option b is correct.
Explanation:
The statement in option ''b" is the correct option for laying emphasis on the main idea and de-emphasizing the minor ideas, that is;
"First, please make the changes to the second section of the proposal changes, and then have Jane proofread the entire proposal."
The above statement is a detailed one and shows the step by step instructions or requirements;
1." First, please make the changes to the SECOND SECTION of the proposal changes.''
The SECOND SECTION the writer mentioned lay emphasis on the second section of the proposal CHANGES AND NOT THE WHOLE.
2. "and then have Jane proofread the ENTIRE proposal"
The writer wants Jane to do the PROOFREADING of the ENTIRE proposal.