Answer:
0.1151 = 11.51% probability of completing the project over 20 days.
Step-by-step explanation:
Normal Probability Distribution
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Expected completion time of the project = 22 days.
Variance of project completion time = 2.77
This means that 
What is the probability of completing the project over 20 days?
This is the p-value of Z when X = 20, so:



has a p-value of 0.1151.
0.1151 = 11.51% probability of completing the project over 20 days.
Answer:
what is the compostie fig.??
Step-by-step explanation:
Answer:
x = 3; y = -6
Step-by-step explanation:
x - 2y = 15
2x + 4y = -18
Multiply both sides of the first equation by 2. Write the second equation below it, and add the two equations.
2x - 4y = 30
(+) 2x + 4y = -18
---------------------------
4x = 12
4x/4 = 12/4
x = 3
Now we substitute 3 for x in the first equation and solve for y.
x - 2y = 15
3 - 2y = 15
-2y = 12
y = -6
Answer: x = 3; y = -6
So basically you want to find the cost per day. So you have 5 days, so divide £100 by 5.
You get £20 per day
Now, the cost per child. We have 80 children so it would be £20/80 children per day.
Our answer is £0.25 per child per day.
Greetings!
Answer:
2370 miles can be travelled
Step-by-step explanation:
If 474 miles can be travelled in 1 hour, this means that to find the total amount in 5 hours we can simply multiply this value by 474:
474 * 5 = 2370
So it can travel 2370 miles!
<h2>Hope this helps!</h2>