1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
zalisa [80]
4 years ago
13

Vanessa made 6 sandwiches for a party and cut them all into fourths. How many 1/4 sandwich pieces did she have?

Mathematics
1 answer:
zvonat [6]4 years ago
7 0
She had 24 pieces.

6 / (1/4) = 24
You might be interested in
The area of circle is 64 square meters.What is the radius?
Mrac [35]

Answer:

radius=8

Step-by-step explanation:

3 0
3 years ago
Read 2 more answers
Michael walks his black lab 6 2/3 miles every week. If he walks his dog every Monday, Wednesday, Friday, and Sunday. How many mi
Elenna [48]

Answer: 1.7 miles

Step-by-step explanation:

dog is walked four times a week

6 2/3 miles in all

6 2/3 divided by 4 = 1.66666667

1.66666667 rounded to nearest tenth = 1.7

6 0
3 years ago
The equation that models the current water temperature t of the swimming pool is t -6=78 which best describes the error made whe
Serga [27]
78! is the answer to this question! trust! -6
3 0
2 years ago
A certain 90-mile trip took 2 hours. Exactly 1/3 of the distance traveled was by rail and this part of the trip took 1/5 of the
antiseptic1488 [7]

The average rate, in miles per hour, of the rail portion of the trip is; D: 75

<h3>How to calculate the average speed?</h3>

Since exactly 1/3 of the distance travelled was by rail, then we can say that;

(1/3) * (90) = 30 miles

We are told that part of the trip took 1/5 of the travel time. Thus;

Time it takes to travel that distance is:

(1/5) * (2) = 2/5 of an hour

Average rate is;

30/(2/5) = 150/2 = 75 mph

Read more about Average speed at; brainly.com/question/4931057

#SPJ1

7 0
2 years ago
Worker A finishes the job in 10 hours; worker B finishes it in 12 hours, and worker C finishes it in 15 hours.
nika2105 [10]
A=1/10, b=1/12, c=1/15  (these are the rates for each worker...)

1.)

2(1/10)+4(1/12)+t/15=1

1/5+1/3+t/15=1

(3+5+t)/15=1

3+5+t=15

8+t=15

t=7

So it would take c 7 hours to finish the job.

2.)

1/40-1/60

(3-2)/120

1/120

The drain rate is 1/60.  So you will need to find t when the tank is empty, while starting at 2/3 capacity...

2/3-t/60=0

(40-t)/60=0

40-t=0

t=40

It would take 40 minutes to empty the tank when it is 2/3 full.
5 0
4 years ago
Other questions:
  • How do I solve this equation
    10·2 answers
  • What is the best estimate for the product of 289 and seven
    9·1 answer
  • What is the point slope form for (-2,3);m=-1
    13·1 answer
  • Need help geometry question central angles and arcs !!! plss
    9·1 answer
  • HIiiiiiiiiiiiiiiiiiiiiiiiii
    8·1 answer
  • Sam Snail is at the bottom of a pipe 30 feet deep. He can crawl three feet up each day, but each night he slides back two feet.
    13·1 answer
  • Which is the correct algebraic expression<br> please help image attached I'll give brainliest
    9·1 answer
  • A dinner plate has a circumference of 100.48 cm. What is the area of the dinner plate? Use 7 = 3.14.
    10·1 answer
  • Olve the following proportion.<br> x-1<br> 5<br> x-1<br> 2<br> x = [?]<br> =
    11·1 answer
  • Solve the system of equations:x + 3y - z = -4 2x - y + 2z = 13 3x - 2y - z = -9
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!