Answer:
Average fixed cost= $1.43
Explanation:
Giving the following information:
Production costs:
Rent= $5,000
Direct labor= $2,500
Direct material= $5,000
Usually, the direct labor cost is variable. In some conditions, it is a fixed cost. <u>We will consider it as a variable cost.</u>
Total fixed cost= 5,000
Average fixed cost= 5,000/3,500
Average fixed cost= $1.43
<u>Assuming that a credit for merchandise returned of $1,000 is granted prior to payment and the invoice is paid within the discount period, the amount of cash that should be received by the seller is (a) $10399</u>
<u />
Explanation:
In the first step we will deduct the credit for merchandised return from the merchandise price
=($11,100-1$000)=$10,100
-------(a)
Then we multiply the result by terms (i.e 1/10=.01)
=($10,100*.01)=$101----------(b)
<u>Then we subtract the result of equation a with equation b</u>
($10,100-$101)=$9,999
Then we add the prepaid freight charges to the result obtained
($9,999+$400)=$10399
<u>Answer: </u>$10399
Values, goals, opportunity cost.
Answer:
- Strengthen security forces where vandalism is most prevalent.
-Horizontal directional drilling (HDD) technology in all of its pipelines. HDD, or slant drilling DEFINITION-practice of installing underground pipes without the need to dig trenches, as pipes are pulled along a prescribed bore path made through surface-launched drilling rigs.
-Technology like SCADA to minimise response time and know exactly where the pipeline vandalism is taking place.
Explanation: