Answer:
4,250,000 riyals
Step-by-step explanation:
The total cost of drilling a 500-meter well is the sum of fixed costs (1,000,000 riyals) and variable costs.
By integrating the marginal cost function we get the variable costs function. Evaluating the variable costs function from 0 to 500 meters, gives us the total variable cost.

Total cost of drilling is:

Answer:
A.f(x)
Step-by-step explanation:
Sup dude it's been a while since khelcee talked to us.
Answer: She will loose 75 min. (1 hour and 15 minutes)
Step-by-step explanation:
Answer:
true
Step-by-step explanation:
Answer:
the graph is at 4 1/2 and 0 is that what you were looking for
Step-by-step explanation: