Answer:
1. Current bonds price = $81.86.
2. Yield to maturity = 22.16%.
3. 3. Expected Return = 7.5%.
Explanation:
Required Rate = Rf + beta*MRP
= 5% + 0.25*(15% - 5%)
= 5% +0.25*10%
= 5% + 2.5% = 7.5%
Required Rate = 7.5%
Expected Future Value = 70% x $100 + 30% x $60
= (0.7*$100) + (0.3*$60)
= $(70+18) = $88
Expected Future Value = $88
1. Current bonds price = 88/1.075 = $81.86
2. Yield to maturity = 100/81.86 - 1 = 1.22159785-1 = 0.22159785 = 22.159785% = 22.16%
3. Expected Return = 7.5%
Answer:
C. The site focuses on testimonials from people who recommend the product.
Answer:
XOXO
1. Predetermined Manufacturing Overhead (MOH) rate = estimated overhead divided by total direct labor = $4,600/460 = $10 per direct labor
2. Analysis of cost per set for Job 12:
Raw materials:
Electronic parts: 40 units at $20 per unit = $800
Plastic: 10 kilograms at $10 per kilogram 100
Labor hours: 60 hours at $25 per hour 1,500
Manufacturing overhead applied $10 per 600
labor hour
Total Cost $3,000
Divided by 30 sets = $100 per set
Explanation:
The manufacturing overhead rate is the rate at which overhead will be charged to the jobs completed as part of the cost of production. As an estimate, it can be overapplied or underapplied.
Even though there was a miscommunication in the sale, Jones did not know that the stone was a diamond before selling it and Smith can easily say he did not know it was either. If Jones had taken the stone and received other opinions on it, he may have gotten more money but because he sold the stone, there is nothing he can take action on Smith for.