Each flow element requires a test gauge ---> 32*80 = $2560
Each flow element needs total of 6 feet of tubing ----> 32*6 = 192 ft
price per foot = 6/100 = $.06
-----> 192*.06 = $11.52
Each 3-ft length of tubing requires 2 connectors. ----> (192/3)*2 = 128
-----> 128*2.5 = $320
Total Cost = 2560 + 11.52 + 320 = $2891.52
Subtract from budget:
3000 - 2891.52 = $108.48
y = csc x doesnt have any zeros.
Answer:
Step-by-step explanation:
Start by writing these five numbers in just one format (improper fractions with denominator 10):
9/5 = 18/10, and
-2.5 = -25/10, and
-1.1 = -11/10, and
-4/5 = -8/10, and, finally
0.8 = 8/10
The smallest of these (the least) is -25/10, and
the largest is 18/10.
Arranged in ascending order, we have:
-25/10, -11/10, -8/10, 8/10, 18/10, or
-2.5, -1.1, -4/5, 0.8, 9/5
Answer:
x=5
y=1
Step-by-step explanation:
3*5=15
5*1=5
15+5=20
Answer:
a)20 is the answers for the question
Step-by-step explanation:
please give me brainlest and follow me