<h2>The graph of y = ax^2 + bx + c
</h2><h2>A nonlinear function that can be written on the standard form
</h2><h2>ax2+bx+c,where a≠0
</h2><h2>All quadratic functions has a U-shaped graph called a parabola. The parent quadratic function is
</h2><h2>
y=x2
</h2><h2>
The lowest or the highest point on a parabola is called the vertex. The vertex has the x-coordinate
</h2><h2>x=−b2a
</h2><h2>The y-coordinate of the vertex is the maximum or minimum value of the function.
</h2><h2>a > 0 parabola opens up minimum value
</h2><h2>a < 0 parabola opens down maximum value
</h2><h2>
A rule of thumb reminds us that when we have a positive symbol before x2 we get a happy expression on the graph and a negative symbol renders a sad expression.
</h2><h2>The vertical line that passes through the vertex and divides the parabola in two is called the axis of symmetry. The axis of symmetry has the equation
</h2><h2>x=−b2a
</h2><h2>The y-intercept of the equation is c.
</h2><h2>
When you want to graph a quadratic function you begin by making a table of values for some values of your function and then plot those values in a coordinate plane and draw a smooth curve through the points.</h2>
<span>Since it is given that AB ≅ AC, it must also be true that AB = AC. Assume ∠B and ∠C are not congruent. Then the measure of one angle is greater than the other. If m∠B > m∠C, then AC > AB because of the triangle parts relationship theorem. For the same reason, if m∠B < m∠C, then AC < AB. This is a contradiction to what is given. Therefore, it can be concluded that
Answer: Angle (B) is Congruent to Angle (C)
Hope it helps
</span>
Answer:
160
Step-by-step explanation:
60-24=36 left
24 x 8 = 192
36/2=18
9 x 12 =108
108+192=300
300-140= 160 euros profit
Answer:
20/7 days (just less than 3 days)
Step-by-step explanation:
Recall that (1 job) = (rate)(time), so time = (1 job) / (rate).
Set up and solve the following equation:
1 job
------------------------------- = time required for 2 pumps working together
1 job 1 job
---------- + -------------
4 days 10 days
This comes out to:
1 job
------------------------------------------- = time required
10 job-days 4 job-days
------------------ + -----------------
40 days 40 days
or:
1 job
-------------------- = (40/14) days, or 20/7 days (just less than 3 days)
14 job·days
-----------------
40 days
The answer to this would be 480. ((: