1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Katarina [22]
3 years ago
13

Identify the goals of the central bank when creating monetary policy. Check all that apply.

Social Studies
2 answers:
VARVARA [1.3K]3 years ago
4 0
Monetary policy<span> is the process by which the </span>monetary<span> authority of a country, like the central bank or currency board, controls the supply of money, often targeting an inflation </span>rate<span> or </span>interest rate<span> to ensure price stability and general trust in the currency.</span>
jasenka [17]3 years ago
4 0

Answer:

The correct answers to the question: Identify the goals of the Central Bank when creating monetary policy, would be: 2. Influencing the business cycle, 4. Encouraging economic growth and 5. Avoiding periods of time where little credit is available.

Explanation:

The purpose in creating Central Banks in countries is to have an institution that helps stabilize the internal economy of a nation and protect it from the repercussions of economic decissions from outside. As such, their role, as buffers, is not only to maintain a stable flow of money, through the issuing of coinage, but also, through the issuing of policies that enhance the creation and maintenance of businesses, but also the investement of capital into businesses. This is why the answers are 2, 4 a 5.

You might be interested in
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
We don't know yet who the stranger is that carried jem home, but you might have a good idea
guajiro [1.7K]
<span>Both the siblings were followed and attacked by Bob Ewell on the night of Scout’s paegent. This assault might be an act of revenge on their father Atticus. Arthur “Boo” Radley is the stranger who rescued Jem and took him home.</span>
7 0
3 years ago
Based on the information in this table, which country MOST supports female participation in the democratic process?
erik [133]

Answer:

A. Italy

Explanation:

7 0
3 years ago
D. How did climate and the geography affect farmers?
ipn [44]

Answer:

Climate change can disrupt food availability, reduce access to food, and affect food quality. For example, projected increases in temperatures, changes in precipitation patterns, changes in extreme weather events, and reductions in water availability may all result in reduced agricultural productivity.

Explanation:

google says so

3 0
3 years ago
Read 2 more answers
Which of the following is false regarding legal cases discussed in the text? Ultramares corporation v. Touche established Ultram
nevsk [136]

Answer: Ultramares corporation v. Touche established Ultramares doctrine. Hochfelder v. Ernst & Ernst ruled that scienter is required before CPAs can be held liable.

Explanation:

All the options except the above are true. Ultramares corporation v. Touche did establish the Ultramares doctrine.  

United States v. Natelli sentenced two CPAs to prison for a year, in addition to fines, for violating the Securities Exchange Act of 1934.

Bily v. Arthur Young did not uphold the restatement doctrine. The restatement doctrine restatement doctrine makes an auditor liable to people who rely on the quality of his work be they his clients or third parties. Two high courts ruled that auditors are not liable to third parties who use their work but only to the party that contracted their work.  

However, Hochfelder v. Ernst & Ernst ruled that an allegation of scienter (an intention to deceive) is not required before CPAs can be held liable as long as the actions constitute actual deception.

While rule 10b-5 of the Exchange Act states the presence of scienter as a requirement to commit an offense, the court ruled against the statute by eliminating the Scienter clause from criminal statute and ruled against Ernst & Ernst.

8 0
3 years ago
Other questions:
  • How did students activities oppose segregation and justice in Selma
    9·1 answer
  • Why did it take so long for early people to reach South America
    6·2 answers
  • When the United States declared war on Japan and Germany in 1941, it permanently ended a longtime policy of
    8·1 answer
  • A republic is another name for what kind of government?
    13·1 answer
  • Local governments in the United States use ________ to regulate land uses in specific areas to prevent any interference with exi
    7·1 answer
  • Former atlanta mayor ivan allen, jr., received the martin luther king, jr., nonviolent peace prize in 1981. which best explains
    8·2 answers
  • What is the geographic significance of the pediment region of Georgia
    15·1 answer
  • On an international level, which of these would be recognized as a 'state'?
    7·1 answer
  • Please guys help please it is<br><br><br><br> fill in the blank<br>​
    13·1 answer
  • What was the contribution that Abraham, Moses, David, and Solomon made to the origin and development of Judaism.
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!