Answer:
a)None
b)All
this is ur answer from my opinion
Answer:
Liam could
1) Change the password
Be sure to change the password to a "strong" one (containing lots of characters, numbers, symbols) so that way the password would be difficult to guess.
2) Avoid logging onto social media on public computers or WiFi connections.
Using public WiFi leaves you vulnerable to someone accessing your information through Internet traffic. If you do use public computers, just make sure to log out.
3) Avoid giving out account information to friends and avoid opening suspicious links and emails.
Opening suspicious links or emails could allow malware to infect your computer the moment you open them. Friends can unknowingly share these links that are designed to steal information.
I hope this helped <3 please lmk if there's anything more to add.
Hard Disk Drive
Solid State Drive
And Random Access Memory (RAM)
Answer:
The formula for the given problem is given below:
= (1+B$12)×B13
Explanation:
Immediately you do one, then you can autofill the formula to the mentioned range B15:B17 and then to C14 to H17
When been done correctly, this is how the formula will look in those cells if you do it correctly.
Check the file attached below to see it.
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.