So to maximize profit 24 downhill and 20 cross country shouldbe produced
Step-by-step explanation:
Let X be the number of downhill skis and Y the number of cross country skis.
Time required for manufacturing and finishing each ski are: manufacturing time per ski, downhill 2.5 hours, cross country 1.5 hours
Finishing time per ski: downhill 0.5 hours, cross country 1.5 hours.
Total manufacturing time taken = (2.5) x+ (1.5+) y = 2.5x+1.5y≤90
total finishing time taken = 0.5x+1.5 y≤42
Profit function
Z = 50x+50y
Objective is to maximize Z
Solving the two equations we get intersecting point is
(x,y) = (24,20)
In the feasible region corner points are (0.28) (36,0)
Profit for these points are
i) 2200 for (24,20)
ii) 1400 for (0,28)
iii) 1800 for (36,0)
So to maximize profit 24 downhill and 20 cross country shouldbe produced.
Answer:
<em>First even integer: 6</em>
Step-by-step explanation:
<u>Inequalities</u>
Assume x is the first even integer. The next integer is x+2, and the last integer ix x+4.
The condition states that the sum of the first and the second number is 15 less than three times the third. This takes us to the inequality:
Operating:
Subtracting 2 and 2x:
Simplifying:
Solving:
x>5
There are infinitely many solutions. For example, for x=6 (first even number into the solution interval):
First integer: 6
Second integer: 8
Third integer: 10
There are other solutions, like 20,22,24 but the first set is 6,8,10.
Answer:
True
Step-by-step explanation:
4x<8
divide
x<2
22 since it occurs the most.
Answer:
<h2>Fraction</h2>
Step-by-step explanation:
The definition of a rational number is that is can be written as a fraction. Other irrational numbers, such as pi, cannot be.