Answer:
Total amount= $2,055.38
Explanation:
Simple interest is defined as the amount that a lender charges the borrower for the funds collected. The borrower pays back the principal collected and the interest to the lender.
Simple interest is calculated as principal multiplied by time multiplied by interest rate.
Interest= principal * time * rate
Interest= 1,890* 2.5* 0.035
Interest= $165.375
Therefore total amount of money in the account is
Total amount= principal + Interest
Total amount= 1890+ 165.375
Total amount= $2,055.375~ $2,055.38
A store asked 250 of its customers to study the relationship between the amount spent on groceries and income. a meaningful display of the data from this study would be <u>a scatterplot</u>
<u></u>
Using Cartesian coordinates, a scatterplot is a form of plot or mathematical diagram that shows values for typically two variables for a set of data. An additional variable can be shown if the points are color-, shape-, or size-coded.
When one continuous variable is under the experimenter's control and the other depends on it or when both continuous variables are independent, a scatterplot can be utilized. The data are shown as a series of points, with each point's value dictating its position on the horizontal axis and its value dictating its position on the vertical axis.
<u></u>
To know more about scatterplot
brainly.com/question/25280625
#SPJ4
Correct/Complete Question:
What is the time of the slowest workstation in a production system?
A. utilization
B. bottleneck time
C. effective capacity
D. throughput time
Answer:
B, bottleneck time
Explanation:
A bottleneck in a production system refers to a constraint in the production system where supply takes the longest time to meet up with demand for a particular good.
In the production processes, bottleneck time is the time takencapacity of the ful in a certain process of production as a result of the limited capacity of the process, thereby reducing the entire production chain.
Simply put, a bottleneck is a delay in time of one of the production process thereby slowing down the entire production system.
Cheers.
Answer and Explanation:
The computation is shown below:
a. As a premium expense
= ($0.460 - $0.44) × 695,000
= $13,900
b. As a difference of 3 months spot rate and spot rate
= ($0.455 - $0.44) × 695,000
= $10,425
The first one represents the premium expense for $13,900 and the second part represents the adjustment to the net income in a positive way
Answer:
D.
project completion constraints
Explanation:
can u make this brainly