Answer:
50+0.03x
Step-by-step explanation:
All you need to do is look at the numbers given in the word problem and convert them to algebraic terms.
0.625 day to grow 1 cm.
16/10 = 1.6 cm in day.
I hope that help ✌️
Answer:
a= 5 and b=1
Step-by-step explanation:
To solve, we will follow the steps below:
2x + 3y = 7
(a-b)x + (a+b)y = 3a + b - 2
We should note that since it has infinitely many solutions then,

Hence
2/a-b = 3/a+b = 7/3a +b-2
2/a-b = 3/a+b
cross-multiply
3(a-b) = 2( a+b)
open the bracket
3a - 3b = 2a + 2b
collect like term
3a - 2a = 2b + 3b
a = 5b -------------------------------------------(1)
Similarly
3/a+b = 7/3a +b-2
cross-multiply
7(a+b) = 3(3a+b -2)
7a + 7b = 9a + 3b -6
take all the variables to the left-hand side of the equation
7a - 9a+ 7b-3b = -6
-2a + 4b = -6 ---------------------------------(2)
but a = 5b
substitute a= 5b in equation (2) and solve for b
-2(5) + 4b = -6
-10 + 4b = -6
add 10 to both-side of the equation
-10 + 10+ 4b = -6+10
4b = 4
divide both-side of the equation by 4
b = 1
substitute b= 1 in equation (1)
a = 5b
a =5(1)
a=5
Therefore, a= 5 and b=1
Answer:
Perimeter: 22cm Area: 24cm^2
Step-by-step explanation:
To find perimeter we add all the sides together. There are two missing sides in this picture.
The bottom one is found by adding the two top lines 4 + 2 = 6
The one on the right can be found by subtracting the left line and the given right line 5 - 2 = 3.
Now we have all the lines, add them together we get 22cm!
Now, there are two ways to find the area. Of course I’m going to show the one I prefer.
Imagine the chunk in the top right is not missing; what would the area of the rectangle be? 30cm^2
And now what’s the area of the missing chunk?
Our given line multiplied by the one we calculated for: 6cm^2
Now subtract the whole rectangle minus the piece we are missing 30 - 6 = 24cm^2
Answer:
[22.57 ± 2.776]
Step-by-step explanation:
Hello!
You have the 95% Confidence Z-interval (21.182;23.958), the mean X[bar]= 22.57 and the sample size n=25.
The formula for the Z interval is
[X[bar] ±
]
The value of Z comes from tha standard normal table:

The semiamplitude (d) or margin of error (E) of the interval is:
E or d= (Upperbond- Lowerbond)/2 = (23.958-21.182)/2 = 2.776
[X[bar] ± E]
[22.57 ± 2.776]
I hope it helps!