Any answers or suggestions

Mathematics
1 answer:
laila [671]4 years ago
6 0
I did problems like that by marking the coordinates. For example it says A was at (2.3), so you’d go over 2 and up 3. Then you’d do the same for points B and C. After that you would connect the dots with lines, and it would show that both triangles are the same size meaning that it couldn’t be a dilation, since that would make the triangle be either bigger or smaller in size. The triangles would be facing the same direction, so it couldn’t be reflected over anything or rotated. The answer would be D) translation, because the image of the triangle was translated to the right 2 and up 2 for all of the points.
You might be interested in
-4x -6 = 3 - 5x<br> Solve for x pls
ycow [4]

Answer:

x = 9

Explanation:

  • -4x - 6 = 3 - 5x
  • Add 6 to both sides

-4x - 6 + 6 = 3 - 5x + 6

-4x = -5x + 9

  • Add 5x to both sides

-4x + 5x = -5x + 9 + 5x

  • x = 9

- PNW

4 0
3 years ago
Read 2 more answers
What is the answer to -5y=80
iVinArrow [24]
All you wanna do is get 'y' by itself so you divide 80 by -5 and you get -16 as the answer
5 0
3 years ago
An externally imposed project completion time sets the project duration at 75 days. The critical path of the project is establis
Katen [24]

Answer:

3 days

Step-by-step explanation:

This can be seen under Schedule management (Initiating)

Project float is simply the difference between the completion period externally imposed and the estimated time duration of the project (usually this is equal to the critical path length). The difference in this case is 0 because

Externally imposed project date = 75 days

Estimated duration of project = 75 days

Hence, a difference in these will be 0

However, a standard deviation of 3 days was giving (This implies that there is a +/- 3 days in the critical path from the estimated project duration) .

Hence the maximum float in this case will be 0 + 3 = 3 days

8 0
4 years ago
A quarter weighs about 0.025 pounds. what is this number written in scientific notation?
Dmitry [639]
It would be 2.5E-2 or with the power of 10 it would be 2.5 x 10^-2
6 0
3 years ago
Read 2 more answers
How does the area of the trapezoid compare to the area of the triangle?
cluponka [151]

Answer:

h/2

Step-by-step explanation:

A=(a+b) h/2

7 0
4 years ago
Other questions:
  • What expression represents five times the quotation of some number and ten​
    14·1 answer
  • Samantha constructed a graph using the coordinates: R(1,8), S (7,9), T (7,3), and U (1,2). How long is the segment ST in Samanth
    10·1 answer
  • In f(x) = a|x - h| + k<br> is a the slope?<br> what's the y-intercept?
    13·1 answer
  • X + 4y = 8<br> 4x + y = 2
    11·1 answer
  • What is the answer to this equation?
    9·2 answers
  • Write 43.75 as a reduced fraction.
    15·1 answer
  • Help I need help I need answers by today someone please help me
    14·1 answer
  • I need the answer, please. And if you don't see it let me know
    9·2 answers
  • Please solve it help me ..............<br>​
    8·1 answer
  • What is the length of BC in the right triangle below?
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!