If a2 -2ab + b2 = 9 and a![\begin{gathered} a^2-2ab+b^2=9 \\ aStep 1 factorize[tex]\begin{gathered} a^2-2ab+b^2=(a-b)^2 \\ \end{gathered}](https://tex.z-dn.net/?f=%5Cbegin%7Bgathered%7D%20a%5E2-2ab%2Bb%5E2%3D9%20%5C%5C%20a%3C%2Fp%3E%3Cp%3E%EF%BB%BFStep%201%20%3C%2Fp%3E%3Cp%3Efactorize%3C%2Fp%3E%5Btex%5D%5Cbegin%7Bgathered%7D%20a%5E2-2ab%2Bb%5E2%3D%28a-b%29%5E2%20%5C%5C%20%20%5Cend%7Bgathered%7D)
then
[tex]\begin{gathered} (a-b)^2=9 \\ \sqrt{(a-b)^2}=\sqrt{9} \\ a-b=\pm3 \\ \\ aa-b=-3
Answer:
or one seven eighteenths
Step-by-step explanation:
we know that
12 one half times one nine is the same that multiply 12 one half by one nine
so

Convert mixed number to an improper fraction

substitute

Convert to mixed number

therefore
12 one half times one nine is one seven eighteenths
Answer:
d. The mapping represents y as a function of x, because each x-value corresponds to exactly one y-value.
Step-by-step explanation:
This would be a function as long as one x-value doesn't correspond to two y-values. If two x-values correspond to one y-value though, it still represents a function.
Answer:
112 tiles
Step-by-step explanation:
3280.839895 ft = 1 km
60 ft = 60/3280.839895 = 0.018288 km
60 ft/s = 0.018288 km/s = 0.018288 x 60 x 60 = 65.8368 km/h