Answer:
There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.
Answer:
There are up to 12 lights and or plugs on that circuit. A 1000w HPS or Metal Halide light takes 9 amps at 120 volts so you can only run one on a wall outlet circuit. A standard dryer outlet is 220 volts and 30 amps so you can power up to six 1000 watt lights on that circuit.
The tab keys are used to advance the cursor to the next tab stop.
Answer: Formulating your brief
Explanation:
The key stage that involves considering design options is formulating one's brief.
The aim of "Formulating Your Brief" is simply a way to determine the context in which a particular work will be to be undertaken after which the aim is then defined. It can either be formal or informal.
Answer:
It uses small dots (usually thousands) to create images and specify colors is the correct answer.
Explanation:
A bitmap graphic is also known as raster, and it is created by putting together rows of pixels. Later, these pixels will form a complete image, that could only be black and white (using only these colors) or similar to a photography (which will lead to use as many colors as necessary). Different programs are used to create bitmap graphics.