For this case, the first thing we must do is take into account the definition of the axes:
the x axis is time in seconds
the y axis is velocity in meters per secon
Then, we look for the cut point with the y axis, which is given by:
(0, 2)
This means that the initial speed is 2 m / s.
We now look for the cut point with the x axis, which is given by:
(8, 0)
This means that the speed is 0 m / s, so the runner stopped when the time is 8 seconds.
Answer:
The initial velocity of the runner was 2 m / s, and the runner stopped after 8 seconds.
Step-by-step explanation:
Answer:
512
Step-by-step explanation:
the number of subsets of the set {1, 2, 3, ..., 9} is : 2^9 = 512
In the morning she worked 3 hours and 45 minutes. In the afternoon she worked 5 hours and 15 minutes. That is a total of 9 hours. At $16.50 per hour for 8 hours that comes to $132. Plus the 1 hour over time with breaks down to $18.50 plus $8.25 totaling $24.75. Add that to the $132 and she made a total of $156.75 for Wednesday’s work. I hope this helps with your question.