Answer:
it b
Step-by-step explanation:
Answer: Our required probability is 0.55.
Step-by-step explanation:
Since we have given that
Probability that chance of winning the hotel bid = 40%
Probability that no chance of winning the hotel bid = 100-40=60%
Probability that chance of winning the office building bid = 25%
Probability that no chance of winning the office building bid = 100-25 = 75%
So, Probability that the company will win at least one contract is given by
![0.4\times 0.75+0.6\times 0.25+0.4\times 0.25\\\\=0.55](https://tex.z-dn.net/?f=0.4%5Ctimes%200.75%2B0.6%5Ctimes%200.25%2B0.4%5Ctimes%200.25%5C%5C%5C%5C%3D0.55)
Hence, our required probability is 0.55.
Javier rode his bike for a total of 40 minutes.
Let x be the minutes Javier ride after lunch
Let y be the minutes Javier ride before lunch
The number of minutes he rode after lunch is 4 times the number of minutes he rode before lunch
x = 4 y
The number of minutes he rode after lunch + number of minutes he rode before lunch = 40
x + y = 40
We know x= 4y
4y + y = 40
5y = 40
y = 8
x= 4y so x= 4(8) = 32
Javier ride 32 minutes after lunch
Answer:
= 45 miles per hour
Step-by-step explanation:
First, we want a unit rate where 1 is in the denominator.
So we divide,
180 miles/ 4 hours both ÷ by 4
= 45 miles/ 1 hour
= 45 miles/ hour
= 45 miles per hour