Answer:
Step-by-step explanation:
ratio of 216 : 64
bigger is 20 inches
so divide 20 by 216... to find the unit.. then multiply that by 64 to find the size of the other
20/216 = 0.0925925
0.0925925 * 64 =5.9259"
so about 6 inches
and Hi :D
Slot method or permutations
top 3
6 for first slot
5 for 2nd slot
4 for 3rd
6*5*4=120
120 possiblites
answer is C
So u have to solve for p to do that you must isolate p by moving -6 after the equal sign -5+6=1 and there is the answer: 1 hope this helps!!
Answer:
g(x) is a quadratic function ⇒ 2
Step-by-step explanation:
- The quadratic function is the function that has 2 as the greatest power of the variable
- The form of the quadratic function is f(x) = ax² + bx + c, where a, b, and c are constant
Let us use the information above to solve the question
∵ f(x) = 
∵ x is the exponent of the base 1.5
→ That means f(x) is not in the form of the quadratic function
∴ f(x) is not in the form of the quadratic function above
∴ f(x) does not represent a quadratic function
∴ f(x) is not a quadratic function
∵ g(x) = 500x² + 345x
∴ The greatest power of x is 2
→ That means g(x) is in the form of the quadratic function above
∵ g(x) is in the form of the quadratic function above, where a = 500,
b = 345, and c = 0 (constant values)
∴ g(x) represents a quadratic function
∴ g(x) is a quadratic function
John and Mar need 14 minutes complete shovel their driveway together, to the nearest minute.
<h3>What is rate of doing work?</h3>
You can use this computation to determine the hourly value of each employee's job, allowing you to more effectively and efficiently plan your staffing needs in the future.
This is crucial because it enables you to determine the ideal workforce size based on your average hourly wage.
According to the question;
by calculating the fraction of unit work that each individual can finish in a given amount of time together work is estimated.
Mary can clear 1/20 of a driveway in a minute, but John can clear 1/50 of it in that time.
The both will do the same job in;
= (1/20) + (1/50)
= (5/100) + (2/100)
= 7/100
They'll be finished when they've cleared 100 percent of the driveway, therefore the equation we must finally solve is:
7x = 100.
x = 100/7
x = 14.28
Therefore, when John and Mar will work together, they will shovel the driveway in 14 minutes (to the nearest minute).
To know more about work rate, here
brainly.com/question/1144815
#SPJ4