Y=2/1x+3
you look at the rise over run the look at where it hits the line on the y line

The absolute value of any number is always positive

Add the numbers

<u>Thus, Last option is the correct choice!!~</u>
Answer: See explanation
Step-by-step explanation:
You didn't give the options relating to the question.
To solve this first, you need to know that we have to note that (+) × (-) = (-). Therefore, 1.25+(-0.75) will be thesame as writing 1.25 - 0.75. This will then be:
= 1.25 - 0.75
= 0.50
Answer:
40 hours will it take for the pool to fill.
Step-by-step explanation:
A pump can fill a swimming pool in 8 hours.
Work done by pump to fill in 1 hour is 
The pool also has a drain that can empty the pool in 10 hours.
Work done by pump to drain in 1 hour is 
If someone turns on the pump to fill the pool, but forgets to shut the drain.
Work done by both pipe in 1 hour is




Both pipe filled
part of pool in hours = 1
Both pipe filled complete pool in hours = 
Therefore, 40 hours will it take for the pool to fill.
40 minutes is 2/3 of an hour.
30 miles per hour x 2/3 hour = 20 miles.
30 minutes = 1/2 hour.
60 miles per hour x 1/2 hour = 30 miles.
Total = 20 + 30 = 50 miles.