Answer:
Google mid point formula and plug in your variables
Step-by-step explanation:
hope this helps :)
Answer:
$17.97
Step-by-step explanation:
add everything up
- bananas: 6(0.75) = $4.50
- rice milk: $3.49
- strawberries: 2(4.99) = $9.98
You have to estimate the slope of the tangent line to the graph at <em>t</em> = 10 s. To do that, you can use points on the graph very close to <em>t</em> = 10 s, essentially applying the mean value theorem.
The MVT says that for some time <em>t</em> between two fixed instances <em>a</em> and <em>b</em>, one can guarantee that the slope of the secant line through (<em>a</em>, <em>v(a)</em> ) and (<em>b</em>, <em>v(b)</em> ) is equal to the slope of the tangent line through <em>t</em>. In this case, this would be saying that the <em>instantaneous</em> acceleration at <em>t</em> = 10 s is approximately equal to the <em>average</em> acceleration over some interval surrounding <em>t</em> = 10 s. The smaller the interval, the better the approximation.
For instance, the plot suggests that the velocity at <em>t</em> = 9 s is nearly 45 m/s, while the velocity at <em>t</em> = 11 s is nearly 47 m/s. Then the average acceleration over this interval is
(47 m/s - 45 m/s) / (11 s - 9 s) = (2 m/s) / (2 s) = 1 m/s²
Answer:
1:4
Step-by-step explanation:
A scale drawing is a reduced form in terms of dimensions of an original image / building / object
the scale drawing is usually reduced at a constant dimension
scale of the drawing = original dimensions / dimensions of the scale drawing
28/4 = 4
1:4
Answer:
tiana
Step-by-step explanation:
because she took less time in the practise